Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization/Demobilization <br /> Site: Dill Pit Permit Action: 2023 Calculation Permit/Job#: M2009077 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 7/19/2023 County: Elbert Filename: M077-005 <br /> User: JR2 <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $20.26 $36.04 $47.05 <br /> Operating Cost/Hour: $39.51 $76.08 $82.85 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $82.29 $158.17 $175.95 <br /> NON ROADABLE EQUIPMENT. <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Drill/Broadcast 25.00 $6.73 $82.29 1 $89.02 $82.29 $250.00 <br /> Seeder with <br /> Tractor <br /> CatD8T-8 S U 53.08 $255.49 $175.95 1 $431.44 $175.95 $250.00 <br /> CAT 950H 2O.13 $49.32 $82.29 1 $131.61 $82.29 $250.00 <br /> Subtotals: I $652.07 $340.53 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x2,1/2 T. $14.82 1 $14.82 $14.82 <br /> Subtotals: $14.82 $14.82 <br /> CIRCES Cost Estimating Software <br />