My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-12_INSPECTION - M2009077
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009077
>
2023-08-12_INSPECTION - M2009077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 12:00:22 PM
Creation date
8/29/2023 11:16:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
Inspection
Doc Date
8/12/2023
Doc Name
Inspection Report
From
DRMS
To
Tracy and Ed Grimes
Inspection Date
6/15/2023
Email Name
JR1
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip compacted areas-8.5 acres <br /> Site: Dill Pit Permit Action: 2023 Calculation Permit/Job#: M2009077 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Elbert Filename: M077-003 <br /> User: JR2 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $241.38 NA <br /> Operating Cost/Hour: $143.92 100 <br /> Ripper Ownership Cost/Hour: $14.11 NA <br /> Ripper Operating Cost/Hour: $7.45 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total Unit Cost/Hour: $448.16 <br /> Total Fleet Cost/Hour: $448.16 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 8.50 acres Rip Depth(ft): 1.50 Volume: 20,570 BCY or CCY <br /> Source of estimated quantity: Pit floor and internal haul roads <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.56 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 200.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.773 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.773 Acres/hr <br /> Site Altitude: 5,700 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.64 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.64 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 13.25 Hours <br /> Unit cost: $698.391 Per acre Total job cost: $5,936 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.