My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-12_INSPECTION - M2009077
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009077
>
2023-08-12_INSPECTION - M2009077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 12:00:22 PM
Creation date
8/29/2023 11:16:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
Inspection
Doc Date
8/12/2023
Doc Name
Inspection Report
From
DRMS
To
Tracy and Ed Grimes
Inspection Date
6/15/2023
Email Name
JR1
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task#002 Page 2 of 2 <br /> Total Travel Time: 0.4908 minutes <br /> Total Cycle Time: 0.9508 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 4.30 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-120%) 1.100 <br /> Adjusted Capacity: 4.73 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 5700 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift-/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 298.47 LCY/Hour <br /> Adjusted Hourly Unit Production: 247.73 LCY/Hour <br /> Adjusted Hourly Fleet Production: 247.73 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 43.03 Hours <br /> Unit cost: $0.524 /LCY Total job cost: $5,586 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.