My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-12_INSPECTION - M2009077
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009077
>
2023-08-12_INSPECTION - M2009077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 12:00:22 PM
Creation date
8/29/2023 11:16:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
Inspection
Doc Date
8/12/2023
Doc Name
Inspection Report
From
DRMS
To
Tracy and Ed Grimes
Inspection Date
6/15/2023
Email Name
JR1
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Grade pit slopes from 2.5H:1V to 3H:1V <br /> Site: Dill Pit Permit Action: 2023 Calculation Permit/Job#: M2009077 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 7/19/2023 County: Elbert Filename: M077-001 <br /> User: JR2 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $241.38 NA <br /> Operating Cost/Hour: $143.92 100 <br /> Ripper own. Cost/Hour: $0.00 NA <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $426.60 <br /> Total Fleet Cost/Hour: $426.60 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,390 <br /> Swell factor: 1.250 <br /> Loose volume: 1,738 LCY <br /> Source of estimated volume: 1500 ft L x 20 ft H,cut and fill <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 60 feet <br /> Unadjusted hourly production: 1,246.9 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: -5 % <br /> Average site altitude: 5,700 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.