Laserfiche WebLink
C) <br /> RPM,Inc. <br /> were removed from creek bed <br /> except low water crossing to <br /> keep access to all sections of <br /> property.this took about 5 <br /> weeks to complete to as <br /> close as possible to <br /> engineers drawings. If any <br /> more information is needed <br /> please feel free to contact <br /> me. Ed Gibson 719 2481111 <br /> The sender is not in your contact list. <br /> Report Junk <br /> + 004 D, 0 C <br /> In addition,there was a water quality violation brought by the Colorado Division of Public <br /> Health and Environment, Water Quality Control Division(WQCD). We reached out to Mr. John <br /> Jankousky, EME Solutions, in a phone call. He helped Mr. Corona file the required reports to the <br /> WQCD. He stated he does not know of any issues at this time. We also reached out to Mr. Chris <br /> Hayes. He stated in an email dated 8/23/2023 the following: <br /> "I have not had any notices of noncompliance or NOV...There aren't any <br /> ongoing discharges." <br /> According to Mr. Corona in a phone conversation, he applied approximately 200 lbs. of seed to <br /> the regraded and topsoiled area. (There was insufficient available topsoil to fully apply to the <br /> entire site.) You will note the presence of soil pods across the regraded mine waste slopes. These <br /> topsoil pods should function as an ongoing seed source for the site. <br /> The reclamation plan also calls for two cross-slope runoff diversion ditches. Given the rocky <br /> nature of the regraded waste rock slope and the effectiveness of the erosion control ditches, the <br /> waste rock slope shows erosional stability. This is significant, given the site is a high snowpack <br /> area. <br /> 3 <br />