August 23,2023 C-1996-083/13owie No. 2 Mine RDZ <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection R -Roads <br /> R -Availability of Records Y -Reclamation Success <br /> Y -Backfill&Grading R -Revegetation <br /> NA -Excess Spoil and Dev. Waste Y - Subsidence <br /> NA -Explosives R - Slides and Other Damage <br /> Y -Fish&Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan R - Support Facilities Not On-site <br /> N -Other Y - Special Categories Of Mining <br /> R -Processing Waste R -Topsoil <br /> COMMENTS <br /> A complete inspection was conducted by Rob Zuber of DRMS on August 23 and August 24,2023. <br /> BRL has recently worked on repairing the slide at Curve 10 along the road to the D Portal bench. This is further <br /> discussed in other sections. Work on Gob Pile#3 (placement of coverfill) continues, and a truck and excavator <br /> team was seen operating during the inspection. <br /> The weather was clear and warm both days of the inspection. The ground was dry. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(1): <br /> The records were found to be very well organized and complete. Please see the Availability of Records form in <br /> this report. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Six sediment ponds were inspected: B,C,D,F,J,and K.None of the ponds contained water. No significant <br /> problems were identified with embankments, spillways,inlet channels,or other features of the ponds. Pond F had <br /> been cleaned in the weeks before the inspection. <br /> The clear water ditch above Gob Pile 92 is in need of sediment removal,just east of the large bend. No other <br /> problems with ditches were identified. <br /> The Fire Mountain Canal was flowing frill. Some flow was seen in the Deer Trail Ditch. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 2 of 13 <br />