Laserfiche WebLink
/7SZ r�Z-3a <br /> t ` George Robinson-President <br /> 3926 North State Highway 67 <br /> Sedalia, Colorado 80135 <br /> 303.832.7664 <br /> May Day Idaho Mine Complex <br /> August 18, 2023 <br /> Mr. Dustin Czapla RECEIVED <br /> Colorado Division of Reclamation Mining and Safety 21 2023 <br /> 1313 Sherman Street, Rm 215 AUG <br /> Denver, Colorado 80216 <br /> Colorado DivisindfSaee�ama �' <br /> Mining a <br /> Re:OBJECTION TO <br /> Sunrise Mining, LLC <br /> May Day Idaho Mine Complex File No. M-1981 185 <br /> Acreage Release Request(AR-1) <br /> Remove 141.5 acres from permit area. <br /> Dear Mr.Czapla: <br /> Wildcat Mining Corporation (WMC) is the owner of the Idaho Mine(141.5 acres)which is presently one <br /> of two mining units that comprise Permit No. M1981-185Permit). WMC's Idaho Mine is also the subject <br /> of a formal effort by Sunrise Mining Company(Sunrise)to be removed and released from the May Day <br /> Idaho Mine Complex that is subject to the Permit. Wildcat objects to the removal and release of the <br /> Idaho Mine from the Permit. <br /> WMC is the entity that expended the time,effort and resources to obtain the Permit in 2017,which is a <br /> matter of record. In the interim period,WMC has attempted to work with Sunrise to move the joint <br /> May Day-Idaho mine project forward but with little cooperation or assistance from Sunrise. <br /> Considering this recent effort by Sunrise to remove the Idaho Mine from the Permit,WMC respectfully <br /> requests the Division's consideration and adoption of a resolution that addresses the company's <br /> concerns as briefly set forth herein.These concerns have not been addressed or implemented by <br /> Sunrise to date. We respectfully request the following concerns be addressed and resolved, at a <br /> minimum, prior to any consideration of the removal of the Idaho acreage from the May Day Idaho Mine <br /> Permit. <br /> • The Idaho spring and observation well located on the 141.5 acres within the May Day Mine <br /> Permit be sampled prior to the May Day Mine bond being released. During the monitoring <br /> period,WMC requests split samples and copies of all laboratory analytical results. <br /> A hydrogeology report in WMC's possession prepared by Dr. David Gonzales-Fort Lewis College. <br /> Dr. Gonzales determined the May Day historical flooded mine workings may be a potential <br />