Laserfiche WebLink
The Foidel Creek permit is in compliance will all rules pertaining to haul roads, <br /> access roads, and light use roads. <br /> 11. Support Facilities - Rule 4.04 <br /> Support facilities are discussed on pages 2.05-17.1 to 2.05-65.5.6a of Volume I and is <br /> also discussed on pages 2.05-4 to 2.05-6 of Volume II, Maps 15 of Volume IX and <br /> Maps 24 and 26 of Volume V-A. <br /> The Division finds the support facilities in compliance with Rule 4.04. <br /> III. Hydrologic Balance -Rule 4.05 <br /> A. Water Quality Standards and Effluent Limitations <br /> 1. The Division proposes to grant small area exemptions from use of <br /> sedimentation ponds due to the limited size of the areas and due to the fact that <br /> ponds and treatment facilities are not necessary for the drainage to meet the <br /> effluent limitations of Rule 4.05.2 and applicable State and Federal water <br /> quality standards for receiving streams and also due to the fact that no mixing <br /> of surface drainage with a discharge from underground workings will occur. <br /> Discussions of the approved alternate sediment control locations are located <br /> on pages 2.05-82 through 2.05-84.7 in the permit application. No new <br /> alternative sediment control areas are proposed or approved with this permit <br /> renewal. <br /> B. Surface and Ground Water Monitoring <br /> 1. The applicant will conduct monitoring of ground water in a manner approved <br /> by the Division. The ground water monitoring plan can be found in Exhibit <br /> 14, Volume 11-B of the permit application (4.05.13(1)). <br /> 2. The applicant will conduct monitoring of surface water in a manner approved <br /> by the Division. The monitoring plan was submitted under 2.05.6(3)(b)(iv) <br /> and can be found in Exhibit 14, Volume 11-B of the permit application <br /> (4.05.13(2)). NPDES monitoring is conducted under permits CO-0027154 <br /> (surface facilities area), CO-0042161 (Fish Creek Borehole), CO-0036684 <br /> (Fish Creek Tipple), COG-850051 (18RT), COG-00850054(6MN sediment <br /> pond). <br /> 3. The following wells serve as the Foidel Creek Mine's ground water points of <br /> compliance: 97013TM (Twentymile Sandstone), 008-77-58 (Wadge <br /> overburden), 008-AU3 (Fish Creek alluvium), 008-AT-1 (Trout Creek <br /> alluvium), and 008-AV-2 (Foidel Creek alluvium.) <br /> Foidel Creek Mine 27 August 4,2023 <br />