Laserfiche WebLink
mining associated with the No. C-1981-071 permit, all pertinent facilities have been transferred <br /> to the Foidel Creek mine permit. <br /> The Life of Mine (LOM) permit revision (PR-01) application was approved in 1986 to expand <br /> the project into a 35-year mining operation utilizing both room and pillar and longwall <br /> techniques, with a peak production of approximately 3.5 million tons per year. Upon approval of <br /> PR-01, the permit boundary encompassed 13,114 acres and included both federal and privately <br /> owned coal. New and expanded surface facilities were approved under PR-01. These facilities <br /> included an office/bathhouse complex, new conveyor facilities, a transfer building, and 150,000 <br /> ton open coal stockpile and loadout facilities. Additionally, the Fish Creek Borehole dewatering <br /> site and associated treatment ponds were installed on Fish Creek, in TSN, R87W, Section 25. <br /> This borehole discharges treated water to Fish Creek at outfall 001 of CDPS Permit CO- <br /> 0042161. <br /> Permit Revision No. 2 (PR-02), Southwest Mining District, was approved with stipulations on <br /> February 17, 1993. PR-02 approved mining and subsidence in Panels 7, 8, and 9 of the SW <br /> mining district. Mining was completed in this area in 1996. <br /> Permit Revision No. 3 (PR-03), approved May 9, 1996, allowed mining in the Eastern Mining <br /> District of Gate Roads 11 Right through 5 Right, construction of the Southwest Development <br /> Mains, and extraction of Longwall panels 9 Right through 7 Right. Approval of PR-03 expanded <br /> the LOM permit area to 22,694 acres. Extraction of 10,000,000 Tons/year was approved under <br /> Technical Revision No. 28, in 1997. <br /> Permit Revision No. 4 (PR-04), Eastern Mining District(southern area), was approved April 20, <br /> 1998. The revision approved continuation and expansion of mining in the southern portion of <br /> the EMD in portions of sections 21, 22, 23, 24, 27, 28, and 29 T5N R86W. <br /> Permit Revision No. 5 (PR-05), was approved on June 28, 2000 and provided for extension of <br /> mining into the Northern Mining District in portions of the following Sections in TSN, R86W: 8, <br /> 9, 10, 11, 12, 13, 14, 15, 16, 17, 20, 21, and 22. The mine expansion area undermined and <br /> subsided portions of Fish Creek and its associated alluvial valley floor in sections 16, 15, 10 and <br /> 11. <br /> Permit Revision No. 6 (PR-06), was approved on May 21, 2004. Permit Revision No. 6 <br /> provided for continued mining in the Northern Mining District in Sections 3, 4, 7, 8, 9, 10, 11, <br /> 16, and 17 in TSN, R86W. <br /> Permit Revision No. 7 (PR-07), was approved on January 2, 2007, and allowed for continued <br /> longwall and development mining in the Northern Mining District in sections 4, 5, 6, 7, and 8 of <br /> TSN, R86W, and development mining in the Western Mining District into portions of Section 17 <br /> and 18, TSN, R86W, and Section 13 TSN, R87W. <br /> Permit Revision No. 8 (PR-08)was approved on October 30, 2009, and allowed for the <br /> expansion of mining in the Western Mining District with development and longwall mining in <br /> Sections 17, 18, 19, and 20 of TSN, R86W, and 13, 22, 23, 24, 25, 26, and 27 of TSN, R87W. <br /> This Permit Revision includes mining of longwall panels 12L, 13L, 14L, 15L, 16L, and 17L, and <br /> Foidel Creek Mine 13 August 4,2023 <br />