Laserfiche WebLink
• Data validation <br /> • Limitations on data use <br /> • Interpretation and discussion of results <br /> • Recommendations for future activities <br /> • Verification of Butala employee training to visually identify impacted soil <br /> A draft summary report will be delivered in electronic format (e.g., PDF and/or native Microsoft Office files) <br /> to DRMS for review and comment within 60 days of receipt of all analytical data. A final summary report will <br /> be submitted to DRMS,via email as signed PDFs,within 14 days of receipt of comments.Additionally,any other <br /> report or document(e.g., Plan updates) prepared for the project will be delivered in the same manner. Delivery <br /> of reports and documents as noted above will be the responsibility of the Pinyon Project Manager <br /> Quality Control <br /> Rinse Water Blanks <br /> Equipment rinse water blanks will be collected to evaluate field sampling and decontamination procedures by <br /> pouring distilled or deionized water over the decontaminated sampling equipment.One equipment rinse water <br /> blank will be collected each day non-disposable equipment is used. Equipment rinse water blanks will be <br /> obtained by passing water through or over the decontaminated sampling devices and then collecting the water. <br /> The rinse water blanks that are collected will be analyzed for the COCs listed in Table 1. The equipment rinse <br /> water blanks will be labeled, packaged, sealed and transported in the manner described above for the other <br /> samples to be collected. <br /> Field Blanks <br /> There will be no samples collected where dedicated equipment is used and decontamination is not necessary. <br /> Therefore,field blanks will not be collected. Equipment rinse water blanks, as described above in the previous <br /> paragraph,will be collected in place of field blanks. <br /> Temperature Blanks <br /> For each cooler that is shipped or transported to an analytical laboratory, a 40-mL VOA vial (or similar) will <br /> be included that is marked "temperature blank." This blank will be used by the sample custodian to check the <br /> temperature of samples upon receipt. <br /> Assessment of Field Variability(Field Duplicate or Co-located Samples) <br /> Blind duplicate composite soil samples will be collected — approximately I blind duplicate sample per 20 <br /> stockpile composite samples collected. Blind duplicate samples will be assigned their own sample number so <br /> the sample is "blind" to the laboratory. The actual sample location will be documented in the Field Notes. <br /> Field Variances <br /> As conditions in the field may vary, minor modifications to the sampling program may be required. When <br /> appropriate,the Project Manager and QA Officer will be notified,and a verbal approval will be obtained before <br /> implementing the changes. In this instance, an email will also be sent to the DRMS contact for the project, <br /> documenting the change. Modifications to the approved Plan will be documented in the sampling project report. <br /> Mr. Lucas West Page 12 <br /> Environmental Protection Specialist <br />