My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19_REVISION - M2021052 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-19_REVISION - M2021052 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 8:54:15 PM
Creation date
7/19/2023 4:32:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/19/2023
Doc Name Note
General Operation Information
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle gravel Pit#1 Juiy 2023 <br /> 1.3.1.1 Affected Lands <br /> Figure 2, Exhibit B depicts the Permitted Area, Affected Area, and 200-foot offset from <br /> Affected Lands. The Affected Land area is 19.00 acres. <br /> 1.3.1.2 Planned Material Storage Area <br /> The excavated wet gravel material will be stockpiled at the site of extraction and allowed to <br /> drain into the excavated pit and/or the underlying substrate. After the material is dry it will be <br /> transported to the Stockpile Area on the Operations Pad, where it will be stored until ready <br /> for processing. The Operations Pad will be a graded, compacted, graveled pad used to <br /> store equipment, pipes, fuel, scale house, restroom trailer and construction materials. <br /> Stockpiled material to be screened will be placed away from the active mining locations, and <br /> on the Operations Pad as shown in Figure 9, Exhibit C4 which depicts the mining activity <br /> extent for Phase 1, Phase 2, and Phase 3 30% and Figure 10, Exhibit C5, which depicts <br /> the mining activity extent for Phase 3 60% mined conditions. Section 5.2 discusses the <br /> estimated areas and volumes of the planned material storage for each mining phase. <br /> 1.3.1.3 Planned Topsoil &Overburden Storage Areas <br /> The extent(area and volume) of the topsoil and overburden storage/stockpile areas was <br /> calculated assuming that all overburden material and topsoil that are not used for the <br /> construction and reclamation of the perimeter berms will be stockpiled on site. The excess <br /> overburden (30,423 cubic yards [CY])will be temporarily stored as mining progresses to <br /> provide fill in the instance mining ceases. This material will be sold as a secondary <br /> commodity, to allow for the expansion of mining during the 60% to the 100% mining stages <br /> during Phase 3. The excess topsoil (9,539 CY) will also be stored and stabilized with an <br /> upland seed mix. The topsoil (9,006 CY) will be sold as a secondary commodity during the <br /> 60% to 100% mining stages during Phase 3, to allow for mining expansion. Approximately <br /> 533 CY of the excess topsoil will be needed to reclaim the greenbelt areas during final <br /> reclamation during Phase 3 and Phase 4. The location of the stockpile areas is depicted on <br /> Figure 9, Exhibit C4. These stockpile areas are located outside of the mining footprint but <br /> inside the perimeter berm, which provides physical separation between the stockpiles and <br /> any wetland or tailwater channel buffer areas and thus will prevent inadvertent sediment <br /> discharges. A typical soil profile illustrating the average conditions underlying the Permitted <br /> Area is provided in Figure 12, Exhibit D1. Earthwork volume calculations are provided in <br /> Figure 14, Exhibit E1. Section 5.2 discusses the estimated areas and volumes of the <br /> topsoil and overburden materials. <br /> 1.4 Total Parcel Size <br /> The Rifle Pit#1 Property Boundary/parcel size is 58.7 acres. <br /> 1.5 Commodity to be Mined <br /> The site has approximately 226,325 CY of(dry) sand and gravel that will be mined from the <br /> property to provide materials for future projects. The projected duration of the commercial <br /> mining activities is three to five years. <br /> 1.6 Legal Description of the Permitted Area <br /> The legal description of the Permitted Area is provided in Section 2.0. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.