My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19_REVISION - M2021052 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-19_REVISION - M2021052 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 8:42:33 PM
Creation date
7/19/2023 3:41:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/19/2023
Doc Name Note
Exhibit E - Reclamation Plan
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit#1 July 2023 <br /> Table 2. Estimated Timetable for Phases 1-4 Activities <br /> Phase/Stage Estimated Estimated Estimated Estimated Type of Overburden <br /> Duration Depth Earthwork Area Acres Earthwork Volume CY <br /> • Total area= 11.18 acres (for removal of overburden and topsoil) Total overburden=54,111 CY <br /> Phase 1 0 Berm construction and reclamation(of berm) (August-September 2023, includes topsoiling 30"cut=42,267 CY <br /> Site and seeding) =2.87 acres 6"topsoil = 11,844 CY <br /> Development 0 Excess overburden area =varies acres <br /> &Grading 0 Excess topsoil area=varies acres Berm overburden= 11,528 CY <br /> • Perimeter Area outside berm =3.54 acres. Perimeter Area is not expected to require active Berm topsoil=2,305 CY topsoil <br /> 1 -2 months A rox. 30 reclamation due to lack of surface disturbance. Incidental seeding and/or weed treatment Clay and silt- aboutum stiff,, slightly <br /> 1-foot <br /> of <br /> August- inches only, no measurable acreage or treatment cost when combined with contemporaneous berm Excess overburden stockpiled for sale post-berm construction after topsoil, medium moist, <br /> s <br /> All berm September 2023 reclamation. 60% (secondary commodity) =30,423 CY brown <br /> reclamation <br /> will be Excess topsoil stockpiled and seeded that can be sold after 60% <br /> completed (secondary commodity) =9,006CY <br /> during Phase <br /> 1 533 CY of topsoil retained and seeded for use in Phase 3 greenbelt <br /> area reclamation <br /> Phase 2 1-2 months Operations Pad = 1.86 acres 2,999 CY Class 6 No additional overburden will be <br /> Mining September- N/A <br /> Preparation October 2023 removed during this phase. <br /> Phase 3 10.03 acres 226,325 CY <br /> Mining 3-5 years <br /> Extraction and Nov. 2023—Dec. 17—21 feet Varies <br /> Greenbelt 2026 to Dec. 2028 <br /> Reclamation <br /> 1 —1.5 years The estimated area to be mined (processed and stockpiled)at 30% is approximately 3.67 0 The estimated amount of material mined and processed at See Boring 4 Remove estimated 6" <br /> 30% November 2023— 21 feet acres. 30% =70,000 CY of clay and silt; gravel layer <br /> Mining November 2024 to (gravel layer estimated at 1 foot to 22 feet below <br /> May 2025 thickness) surface. <br /> • Underwater and greenbelt reclamation will be completed as mining progresses using GPS 0 Estimated topsoil application 275 CY <br /> 30% Contemporaneous 6 inch topsoil technology. N/A <br /> Reclamation with 30% Mining application 0 Greenbelt area to be reclaimed with Wetland Mix=0.30 acres (275 CY of topsoil) <br /> Cumulative area estimated at 60%=5.58 acres Cumulative volume of material mined and processed at 60% <br /> 1 —1.5 years 0 See Boring 3. Remove estimated <br /> 60% May 2025—May 21 feet 0 Estimated area mined and processed between 30%and 60% = 1.91 acres = 140,000 CY 5.5 feet to 6 feet of clay and silt <br /> Mining2026 to November (gravel layer Estimated volume of material mined and processed between overburden; gravel layer estimated <br /> thickness) 30%and 60% =70,000 CY <br /> 2026 at 7 feet to 27 feet below surface. <br /> • Under water and wetland slope reclamation will be completed as mining progresses using 0 Estimated topsoil application 129 CY <br /> 60% Contemporaneous 6 inch topsoil GPS technology. <br /> Reclamation with 60% Mining application Greenbelt area to be reclaimed with Wetland Mix=0.18 acres, 129 CY of topsoil [cumulative N/A <br /> 0.48 acres, 404 CY total <br /> Cumulative area estimated at 100%= 10.03 acres Cumulative volume of material mined and processed at 100% <br /> 1 —1.5 ears See Boring 3. Remove estimated <br /> 100% November 2026— 21 feet 0 Estimated area mined and processed between 60%and 100% =4.45 acres =226,325 CY 5.5 feet to 6 feet of clay and silt <br /> Mining May 2027 to May (gravel layer 0 Estimated volume of material mined and processed between overburden; gravel layer estimated <br /> 2028 thickness) 60%and 100%=86,325 CY at 7 feet to 27 feet below surface. <br /> • Under water and wetland slope reclamation will be completed as mining progresses using 0 Estimated topsoil application 129 CY <br /> 100% Contemporaneous 6 inch topsoil GPS technology. <br /> Reclamation with 100% Mining application Greenbelt area to be reclaimed with Wetland Mix=0.18 acres, 129 CY of topsoil [cumulative N/A <br /> 0.66 acres, 533 CY total <br /> • Verify the mining slopes and greenbelt area slopes using GPS (labor included) 0 Operations Pad will remain as Class 6 road base applied in <br /> • Reclaim Berm Area(between berm and greenbelt area) =0.70 acres to receive upland seed Phase 2 and maintained for use in Scott's regional <br /> Phase 4 6 months—1 year mix (2.87 acres of the total 3.57-acre Berm Area were seeded during Phase 1). operations. <br /> Final May 2028- NA Operations Pad to be maintained as storage= 1.86 acres,temporary structures removed NA <br /> Reclamation December 2028 (labor and transport included). <br /> The depths and thicknesses are estimated and based upon the nearest exploratory boring logs included in Attachment C. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.