My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19_REVISION - M2021052 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-19_REVISION - M2021052 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 8:42:33 PM
Creation date
7/19/2023 3:41:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/19/2023
Doc Name Note
Exhibit E - Reclamation Plan
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit#1 July 2023 <br /> See Figure 15, Exhibit F1 and Figure 16, Exhibit F2 for proposed reclaimed conditions, including <br /> the typical section of the pond. <br /> 6.1 Description and Types of Reclamation <br /> Scott will achieve the required reclamation of the Affected Lands per the local Garfield <br /> County seeding and vegetation guidelines using existing and available equipment. The <br /> primary reason for this goal is to minimize dust and erosion of the property and restore the <br /> site back to its natural conditions to the extent practicable. <br /> Table 2 and Figure 14, Exhibit E1 describes the amount of acreage proposed for each <br /> reclamation activity. All reclamation will occur with specified equipment and methods for <br /> attaining successful revegetation of the property. It is assumed that a -9.70-acre pond will <br /> be present post-mining, surrounded by the greenbelt area and reclaimed perimeter berm. <br /> The operating area/gravel pad and the small area outside the perimeter berm (3.54 acres) <br /> will also be reclaimed with the upland seed mix, as needed. <br /> 6.1.1 Rule 3.1 -Reclamation Performance Standards and Requirements <br /> Rule 3.1 outlines the Reclamation Performance Standards for all mining operations. <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.