Laserfiche WebLink
Rifle Gravel Pit#1 JUly 2023 <br /> 5.2.2.1 Mining Methods and Earthmoving 28 <br /> 5.2.2.2 Water Diversions and Impoundments 28 <br /> 5.2.2.3 Water Handling, Dewatering, and Permits 29 <br /> 5.2.3 Mining Extraction (Phase 3 [P3]) 29 <br /> 5.2.3.1 Mining Methods and Earthmoving 30 <br /> 5.2.3.2 Water Diversions and Impoundments 31 <br /> 5.2.3.3 Water Handling and Dewatering 31 <br /> 5.2.4 Explosives 31 <br /> 5.2.5 Schedule of Operations 31 <br /> 5.2.6 Existing or Proposed Roads 32 <br /> 5.2.7 Drainage and Runoff Conveyance 32 <br /> 5.2.8 Final Reclamation (Phase 4[P4]) 32 <br /> 6.3 Mining Timetable 33 <br /> 6.0 Exhibit E—Reclamation Plan 33 <br /> 6.1 Description and Types of Reclamation 34 <br /> 6.1.1 Rule 3.1 —Reclamation Performance Standards and Requirements 34 <br /> 6.1.1.1 Materials Handling 37 <br /> 6.1.1.2 Topsoiling 37 <br /> 6.1.1.3 Revegetation 38 <br /> 6.1.1.4 Buildings and Structures 39 <br /> 6.1.1.5 Signs and Markers 39 <br /> 6.1.1.6 Spill Reporting 39 <br /> 6.2 Post-Mining Land Use 39 <br /> 6.3 Implementation of the Reclamation Plan 40 <br /> 6.3.1 Topsoil Segregation, Preservation, and Replacement 40 <br /> 6.3.2 Final Grading 40 <br /> 6.3.3 Seeding 41 <br /> 6.3.3.1 Temporary Seed Mix 41 <br /> 6.3.3.2 Permanent Upland Seed Mix 41 <br /> 6.3.3.3 Wetland Seed Mix 41 <br /> 6.3.4 Fertilization 41 <br /> 6.4 Revegetation Success Criteria 42 <br /> 6.5 Noxious Weed Control 42 <br /> 6.6 Reclamation Plan Schedule 42 <br /> 6.6.1 Previously Disturbed/Unnecessary Areas 42 <br /> 6.6.2 Active Mining Areas 43 <br /> 6.7 Monitoring Reclamation Success 43 <br /> 7.0 Exhibit F—Reclamation Plan Map 44 <br /> 8.0 Exhibit G—Water Information 47 <br /> 8.1.1.1 Water—General Requirements 47 <br /> 8.1.1.2 Groundwater—Specific Requirements 47 <br /> ii <br />