My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19_REVISION - M2021052 (26)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-19_REVISION - M2021052 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 9:04:53 PM
Creation date
7/19/2023 3:32:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/19/2023
Doc Name Note
Table of Contents
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit#1 July 2023 <br /> TABLE OF CONTENTS <br /> 1.0 General Operation Information 1 <br /> 1.1 Applicant/Operator 1 <br /> 1.2 Operation Name (pit, mine or site name) 1 <br /> 1.3 Permitted Acreage 1 <br /> 1.3.1 New DRMS 112 Permit 1 <br /> 1.3.1.1 Affected Lands 2 <br /> 1.3.1.2 Planned Material Storage Area 2 <br /> 1.3.1.3 Planned Topsoil&Overburden Storage Areas 2 <br /> 1.4 Total Parcel Size 2 <br /> 1.6 Commodity to be Mined 2 <br /> 1.6 Legal Description of the Permitted Area 2 <br /> 2.0 Exhibit A—Legal Description 3 <br /> 2.1 Legal Description - Rifle Pit Parcel 3 <br /> 2.2 Legal Description—Permitted Area 3 <br /> 2.2.1 Main Entrance and Access Road 4 <br /> 2.2.2 Operations Area 4 <br /> 3.0 Exhibit B—Index Map 6 <br /> 4.0 Exhibit C—Pre-Mining and Mining Plan Map(s) of Affected Lands 8 <br /> 4.1 List of Permanent Structures 11 <br /> 4.2 Adjoining Surface Landowners Map Information 11 <br /> 4.3 Topography and Aquifer 12 <br /> 4.4 Vegetation 14 <br /> 4.6 Mining Maps 17 <br /> 6.0 Exhibit D—Mining Plan 21 <br /> 6.1 Project Location and Information 21 <br /> 6.2 Mine Facilities and Operation 21 <br /> 5.2.1 Site Development and Grading (Phase 1 [P1]) 22 <br /> 5.2.1.1 Mining Methods and Earthmoving 22 <br /> 5.2.1.2 Planned Topsoil&Overburden Storage Area 23 <br /> 5.2.1.3 Water Diversions and Impoundments 24 <br /> 5.2.1.4 Water Handling, Dewatering, and Permits 24 <br /> 5.2.2 Mining Preparation (Phase 2 [P2]) 28 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.