My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-13_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2023-07-13_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 10:34:04 AM
Creation date
7/14/2023 7:29:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/13/2023
Doc Name
Application
From
Tony Tennyson -Tri-State Generation and Transmission Association, Inc.
To
DRMS
Type & Sequence
SL22
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 PHASE II REVEGETATION SUCCESS STANDARDS <br /> Reference Area Comparisons <br /> In accordance with Colowyo's permit section 4.15 Revegetation Requirements, revegetation success <br /> will be assessed against standards for each mine area separately. A summary of permit requirements <br /> applicable to Phase II success evaluations is presented below [full explanation is detailed in permit Volume <br /> 1, Section 4.15.8]. East Pit and West Pit revegetation blocks are compared against the Mountain Shrub <br /> Reference Area (55% weight) and Sagebrush Reference Area (45% weight) [permit Volume 1, Section <br /> 4.15.7]. <br /> Ground Cover Standards <br /> Revegetation will be deemed adequate if herbaceous perennial vegetation cover of the reclaimed area <br /> exhibits at least 90% of the herbaceous vegetative cover of the appropriate reference area(s) comparison. <br /> [permit Volume 1, Section 4.15.8]. <br /> Sediment Demonstrations <br /> Revegetation will be deemed adequate by demonstrating that the completed revegetation in the Phase <br /> II bond release block has achieved erosion control at least equal to pre-mining levels as required in Rule <br /> 4.15.1 (2) (b), and suspended solids delivered to streamflow outside the permit area will not exceed pre- <br /> mining levels as required under Rule 3.03.1 (3) (b). <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.