Laserfiche WebLink
COST SUMMARY WORK <br /> Task Description: Reclamation cost estimate <br /> Site: Tallahassee Project <br /> TASK LIST(Direct costs) <br /> TASK Description Task Hours Cost <br /> O10 Plug and seal 20 monitoring wells @ 1000 ft. deep 32.00 $ 59,248.00 <br /> 020 Backfill mudpits 1.50 $ 150.00 <br /> 030 Replace topsoil on 20 pads 10.00 $ 1,545.00 <br /> 040 Finish grade 20 pads 1.15 $ 150.00 <br /> 050 Basic Reveg 1.1 acres 10 $ 1,217.00 <br /> 051 Reveg w/mountain mahogany 1.50 $ 202.00 <br /> 060 Mobilize and demobilize 4 $ 4,882.00 <br /> 061 Mob/Demob from Canon City 2.33 $ 3,943.00 <br /> Hours Total: 30.48 <br /> Direct Costs Total: $ 71,337.00 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability insurance: 2.02% $ 1,441.01 <br /> Performance bond: 1.05% $ 770.44 <br /> Job superintendent 30 hours $ 2,250.00 <br /> Profit: 10% $ 7,133.00 <br /> CONTRACT AMOUNT (DIRECT AND O&P) $ 82,931.45 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT <br /> Engineering work and/or contract/bid preparation 4.25% $ 3,524.59 <br /> Reclamation management and/or administration 5.00% $ 4,146.57 <br /> TOTAL BOND AMOUNT $ 90,602.61 <br />