Laserfiche WebLink
standard after 4 growing seasons,supplemental seeding/planting will be conducted to reach <br /> the standard. <br /> Reclamation is further addressed in Sec. 7-1002.H. of the Land Use Code,specifically as it <br /> relates to reclamation of gravel operations, which reiterates the requirement to reclaim <br /> disturbed areas to the 70%standard addressed above. <br /> 18. Section 6.1.1.4 does not address if any newly erected structures will remain post mining. <br /> i.e., will the scale or scale house remain? <br /> The temporary structures placed on the Operations Pad will be removed after mining. <br /> 6.4.6 -EXHIBIT E - Reclamation Plan <br /> 19. Figure 14, Exhibit E1 does not depict which areas will be reclaimed to upland areas, <br /> wetlands or remain graveled. Please shade or otherwise note the final land use for all <br /> areas, per Rule 6.4.6(b). Note that the map states "Reclaimed pond water surface (solid <br /> Blue line) and Reclaimed wetland slope area (solid Green Hatch)", no areas are shaded <br /> or otherwise delineated to differentiate various reclamation methods. <br /> Figures 15 and 16 have been revised to depict the information in Exhibit El. <br /> 20. Figure 14 Exhibit E1, the legend does not specifically relate to reclamation of the <br /> affected lands. Legend describes other land types/features not related to the <br /> reclamation treatments of the affected lands. Per Rule 6.4.6(b) revise the legend to <br /> sufficiently portray the proposed final land use for each portion of the affected lands. <br /> Figures 15 and 16 have been revised to depict the information in Exhibit El. <br /> 21.The permit boundary is not clearly identified on the map as required by Rule 6.2.1(d) <br /> Figures 15 and 16 have been revised to depict the information in Exhibit El. <br /> 22. Within the mine plan, it is mentioned that the affected lands buffer area 4.02 ac needs <br /> upland revegetation as well. Please depict this on Figure 14, Exhibit E1. <br /> Figures 15 and 16 have been revised to depict the information in Exhibit El. <br /> 6.4.7 -EXHIBIT G -Water Information <br /> 23. Commit to providing the Division with all necessary water rights documentation for <br /> mining and reclamation once approved/issued. <br /> Scott will provide the Division with all necessary water rights documentation for mining and <br /> reclamation once approved and issued by the Division of Water Resources. <br /> 24.The Adequacy Response#36 stated that per Section 8.3 it a Substitute Water Supply <br />