Laserfiche WebLink
Loader Worksheet Cont'd Task#002 Page 2 of 2 <br /> Haul Route: 60 0.00 1.20 1.20 0.0429 Cat HB <br /> Return Route: 60 0.00 1.20 1.20 0.0416 (Cat HB) <br /> Total Travel Time: 0.0845 minutes <br /> Total Cycle Time: 0.5245 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 5.00 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-120%) 1.100 <br /> Adjusted Capacity: 5.50 LCY <br /> Job Condition Correction Factors <br /> Site Altitude:7040 feet <br /> Source <br /> Altitude Adj: 1.00 CAT HB <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 629.14 LCY/Hour <br /> Adjusted Hourly Unit Production: 522.19 LCY/Hour <br /> Adjusted Hourly Fleet Production: 522.19 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: I Loader(s) Total job time: 2.14 Hours <br /> Unit cost: $0.245 /LCY Total job cost: $275 <br /> CIRCES Cost Estimating Software <br />