Laserfiche WebLink
Page 1 of 2 <br /> WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Grade and shape parking areas <br /> Site: Colorado Rose Red Pit Permit Action: Insp 2023 Permit/Job#: M1978332 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 6/8/2023 County: Larimer Filename: 002 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 966H Horsepower: 262 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $49.15 NA <br /> Operating Cost/Hour: $43.04 100 <br /> Operator Cost/Hour: $35.97 NA <br /> Total Unit Cost/Hour: $128.16 <br /> Total Fleet Cost/Hour: $128.16 <br /> MATERIAL QUANTITIES <br /> Initial volume: 1,120 CCY Swell factor: 1.000 <br /> Loose volume: 1,120 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump, 0.500 minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Mixed material 0.02 0.020 (Cat HB) <br /> Stockpile: No adjustment-factor not applicable 0.00 0.000 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.060 minutes <br /> Adjusted Basic Cycle Time: 0.440 minutes <br /> Rolling Resistance—Road Conditions <br /> Haul: Very hard,smooth,asphalt or concrete,no tire penetration 1.2 <br /> Return: Very hard,smooth,asphalt or concrete,no tire penetration 1.2 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> (feet) (%) Res. (%) (%) (minutes) <br /> CIRCES Cost Estimating Software <br />