Laserfiche WebLink
This is a violation of C.R.S.34-33-111(1)(a)& (e). <br /> Findings - (Check the appropriate blank): <br /> The condition, practice, or violation is creating an imminent danger to the health or safety of the <br /> public. <br /> X The condition, practice or violation is causing or can reasonably be expected to cause significant <br /> imminent environmental harm to land, air, or water resources. <br /> The Permittee or Operator has failed to abate violation(s)No. included in <br /> Notice of Violation No. within the time for abatement originally fixed or <br /> subsequently extended. <br /> Operation(s)to be Ceased Immediately: <br /> Disturbed and affected land located north of the 2023 topsoil strip/reclaim limit of J Pit West. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br /> Abatement Step# Description <br /> 1 Submit and receive approval of a technical revision to revise the mining and reclamation plans to <br /> cover the unapproved disturbed land. <br /> TIME FOR ABATEMENT(NOT MORE THAN 90 DAYS): <br /> ON OR BEFORE last abatement due date <br /> Abatement Step# Due Date <br /> 1 August 11, 2023 <br /> Affirmative Obligation(s) to Abate Imminent Danger or Harm, if Applicable*: <br /> N.;A <br /> * If imminent danger to public health and safety or imminent environmental harm is found to exist. <br /> Page 4 of 4 <br />