Laserfiche WebLink
Cessation Order No.: CO-2023-001 <br /> Nature of Condition, Practice, or Violation: <br /> Trapper Mining,Inc. ("TMI"or"Permittee") has disturbed and affected land located north of the 2023 topsoil <br /> strip/reclaim limit of J Pit West(as per Map M10B approved with PR11). <br /> r <br /> w,2 ,Si'r � � �• � 5' 1' � <br /> 2 <br /> F#gore 1. Dlslu bed area U idernrJFed wrrh a purple pobVa The area disturbed outside of the approved rapsod strf Maim arw(green pOnoto <br /> is iAw subfecl ofshe Cessation Order_Image from MIOB Map gVroved with PRlI- <br /> Topsoil has been stripped in this area and TMI was actively drilling in preparation for mining this area. This land <br /> is not approved to be disturbed. Therefore,TMI has failed to conduct surface coal mining and reclamation <br /> operations only on those lands contained within the boundaries authorized on the permit application maps for the <br /> term of this permit and only as described in the approved application in accordance with conditions and <br /> agreements No.7 and No.8 of TMI's Coal Mining Permit(Permit No.C-1981-010). <br /> ACT, REGULATION,OR PERMIT PROVISION(S)VIOLATED: <br /> ACT SECTION(S): 34-33-111(1)(a)& (e) <br /> REGULATIONSECTION(S): Rule 2.05.2(2),2.05.3(2)(a) <br /> PERMIT SECTION(S): Permit Application Package Section 3 <br /> Portion of the Operation to which Order applies: <br /> TMI has disturbed and affected land located north of the 2023 topsoil strip/reclaim limit of J Pit West. <br /> This activity constitutes a violation of Rule 2.05.2(2) for failure to provide a general description and appropriate <br /> map(s), prepared in accordance with Rule 2.10 describing the area of land to be affected over the life of the <br /> operation and/or according to the anticipated sequence of mining and reclamation. <br /> This activity also constitutes a violation of Rule 2.05.3(2)(a) for failure to provide a detailed narrative <br /> description and appropriate map(s) prepared in accordance with Rule 2.10,describing the land to be affected <br /> within the permit area according to the proposed sequence of mining and reclamation. Further,this narrative <br /> and/or map(s)shall include detailed timetables sufficient to describe the various mining phases. Finally,the <br /> maximum acreage proposed for each phase of the operation within the permit area must be specified. <br /> Page 3 of 4 <br />