Laserfiche WebLink
,caul Cycle <br /> SimulationFull <br /> Material: [Pitt]Topsoil Haulage System. Haulage System-1 <br /> Roster [PRII 5 day Week-8 Hour Shifts HaulCycle: PIU A99-3 to L Pit Area 6 <br /> Rolling Curve Segment Cycle Max Final Velocity Average Elevation Fuel %Duty <br /> T Se mentTitie Distance Grade Resist A le load Time Time Vel.I Vel. limit. Velocft Chan gel Usage I Cyde <br /> feet %I %I deg min %I mph mph mph feet S. f 0 Hr % <br /> [PRI]Caterpillar 637 G <br /> Queue Queue at loader Auto Mins 0.00 0.00 0.0 <br /> Spat Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 15.55 0.0 <br /> 1 Haul Segment 1478 5.1 3.0 0.0 Full 1.42 44.13 16.1 0.0 Final Sp. 11.8 75.4 0.0 63.7 <br /> Spot Spot Time at Dump Auto Mins 0100 0.00 010 <br /> Dump Dumping Auto Mins 0.20 6.22 0.0 <br /> 1 Haul Segment(rev.) 1478 -5.1 3.0 0.0 Empty 1.10 34.09 31.1 0.0 Final Sp. 15.3 75.4 0.0 8.8 <br /> Total 2,956 3.21 100.00 10.4 0 <br /> Page 7 <br />