Laserfiche WebLink
Productivity <br /> Production Summary - Full Simulation <br /> Haulage System:Haulage System-1 Haul Cycle: [PRJ]A99-3 to L Pit Area 6 <br /> Material:[PRJI To so€I Roster:[PRJI 5 day Week-8 Hour Shifts <br /> Loader [PRJ]Caterpillar 637 G <br /> Availability % 85.00 <br /> Bucket Fill Factor 0.85 <br /> Average Bucket Load Volume cu.yards 28.94 <br /> Average Payload bcy 28.10 <br /> Operating Hours per Year OpHr/Year 4,207.00 Op.hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 601.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Loaded Transport Time min 1.42 <br /> Unloaded Transport Time min 1.10 <br /> Total Loading unit Cycle Time min 3.21 <br /> Transport Distance(One Way) feet 1,478.00 <br /> Production per Operating Hour lacy 398.31 <br /> Production per Loader Operating Shift bcy 2,788 Max.prod.based on 100%avail. <br /> Production per Year bcy 1675 686 Av .production factored by avail. <br /> Haulage System <br /> Production per Year bcy/Year 1,675,686 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br /> Excavation Target bcy 9,000.00 Average for 150 Shifts <br /> Time to move Excavation Target Days 1.96 <br /> Loader Hrs to move Target Op.Hours. 23 <br /> Total Truck Hrs to move Target Op.Hours. 23 <br /> Total cost to move Target $ 0 <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> Equipment data should be checked to ensure it is valid for this site. <br /> Page 1 <br />