Laserfiche WebLink
Table 5-1. Trapper Mine Topsoil Pile Inventory (1) <br />Topsoil Size Approximate Year <br />Pile ID Location Northing Easting (acres) CYDS Created <br />18-2 Johnson Coal Pile 413,427 1,423,038 2.5 20,360 2018 <br />18-3 Ash Dump 405,377 1,424,250 1.2 43,046 2018 <br />19-1 K Ridge Reclamation 404,660 1,437,265 1.2 7,261 2019 <br />19-5 K Ridge Reclamation 403,607 1,437,132 1.9 20,585 2019 <br />A76-4 GB well site 410,070 1,417,400 0.5 7,805 pre 1976 <br />A77-1 A field coal pile 409,850 1,411,300 1.3 10,620 1977 <br />*A91-8 NW Edge of H Pit Reclamation 410,800 1,421,400 5.1 67,159 1991 <br />*A92-1 North A Road East of East Pyeatt 411,900 1,427,900 12.5 336,429 1992 <br />A92-3 North A Road East of West Pyeatt 412,100 1,424,400 0.6 7,632 1992 <br />A92-4 North A Road Middle Pyeatt 411,300 1,425,600 7.2 171,972 1992 <br />A92-5 North A Road West of East Pyeatt 412,670 1,426,360 7.8 194,000 1992 <br />A93-1 A pit South #1 406,550 1,426,040 3.9 150,055 1993 <br />A94-2 E of Grouse Drainage 412,000 1,429,300 4.4 120,606 1994 <br />A96-2 North A Pit west of A 95-2 411,100 1,432,100 3.0 26,216 1996 <br />A97-2 South of LOM Road 408,150 1,429,200 1.5 50,972 1997 <br />A98-3 West Middle Flume Pond #3 407,500 1,438,240 5.3 204,024 1998 <br />A99-3 East Middle Flume Pond 407,630 1,437,275 0.8 9,000 1999 <br />A1-08 East of G1-03 Pile 406,870 1,439,000 5.6 183,982 2008 <br />ASH1_2020 LOM/ASH Road 408,550 1,424,160 1.8 15,129 2020 <br />ASH2_2020 LOM/ASH Road 407,300 1,423,850 3.6 60,000 2020 <br />ASH3_Foster's Pile LOM/ASH Road 409,850 1,424,000 2.3 38,684 2020 <br />ASH4_2020 LOM/ASH Road 411,210 1,424,290 1.3 9,962 2020 <br />ASH1 Johnson Gulch East Tributary 408,000 1,421,200 3.9 97,092 1992 <br />ASH2 Johnson Gulch East Tributary 408,200 1,422,000 1.3 27,486 1992 <br />BUZ92-1 Far East Buzzard Pond #1 411,100 1,410,250 0.4 882 1992 <br />CG1 Coyote Gulch 411,050 1,412,200 4.8 17,253 1978 <br />D93-1 North D pit #1 407,725 1,418,160 0.5 20,570 1993 <br />D97-1 North end Enfield Pit 405,640 1,419,440 1.8 62,216 1997 <br />D1-07 West Spoils Side of North End D-Pit 406,640 1,416,860 1.5 7,476 2007 <br />E78-1 E pit SE pile small 402,490 1,422,730 0.7 10,000 1978 <br />E78-2 Middle E pit pile 404,400 1,423,100 4.5 25,238 1978 <br />E79-4 E pit SE pile large 401,900 1,422,650 2.8 34,010 pre 1979 <br />E79-D22-A D Pit 403,250 1,417,700 4.9 196,448 2022 <br />E79-D22-B D Pit 403,350 1,419,300 0.7 6,957 2022 <br />E87-12 E pit regrade pile 403,850 1,422,350 4.1 73,278 1987 <br />E93-4 North E pit #4 408,750 1,421,050 0.9 14,030 1993 <br />E93-5 Middle E pit #5 403,955 1,419,950 0.8 7,130 1993 <br />E94-1 W of D East Road 404,280 1,420,370 0.3 2,304 1994 <br />E94-2 N of D East Road 407,270 1,418,750 0.2 1,200 1994 <br />G1-01 North of LOM rd @ G Pit 407,740 1,434,270 4.0 101,948 2001 <br />G1-03 East G-Pit 406,526 1,438,555 3.5 89,822 2003 <br />G4-02 North A-E & LOM Roads Intersection 406,728 1,436,968 2.1 137,784 2002 <br />G06-DG Deal Gulch pond 399,380 1,438,040 0.6 10,104 2006/2018 <br />H04 West Horse pond 401,580 1,430,260 0.7 6,244 2004 <br />HRS Horse Pond 403,090 1,432,930 1.0 24,781 2000 <br />I20-1 South of I Pit 411,551 1,414,785 1.5 17,340 2020 <br />I20-2 West end I-Pit 411,903 1,413,603 0.9 22,356 2020 <br />I20-3 North Edge I-Pit 412,122 1,414,412 1.8 17,286 2020 <br />J22-1 J-Pit 410,975 1,415,150 2.1 9,978 2022 <br />J22-2 J-Pit 410,500 1,413,480 1.4 12,376 2022 <br />J22-3A J-Pit 410,360 1,414,800 1.2 13,411 2022 <br />J22-3B J-Pit 410,270 1,414,370 1.0 13,641 2022 <br />Coordinates