Laserfiche WebLink
SECTION 5.0 Topsoil Stockpile Locations <br /> <br /> <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br />the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br />stockpiles proposed for construction during the upcoming year (Map 1). <br /> <br />Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br /> <br />During 2022, Trapper nearly depleted pile E79-6 for reclamation in D Pit, a small portion remains to be <br />moved and used in reclamation of the topsoil pile site. Pile EM-1 was entirely moved to pile I20-1 in the I <br />Pit area. Piles MH2, WC1, I20-2 and NN20-1 all had additional topsoil added to them from stripping <br />operations in I Pit. Trapper also constructed four new topsoil piles, J22-1, J22-2, J22-3A and J22-3B in J <br />Pit. <br /> <br />At the end of 2022, excluding stockpiles abandoned with the approvals of MR-155 and TR-94, there are <br />82 existing topsoil stockpiles at Trapper affecting 182.8 acres and storing approximately 3,539,602 cubic <br />yards of salvaged topsoil. <br /> <br />Proposed new topsoil stockpiles near the C, I and J-Pit area may be constructed in 2023. <br /> <br /> <br />GCR 2/23 <br />[Annual Report\DRMS22RPT\22TStext5-0]