Laserfiche WebLink
The existing buildings on the permitted site will be utilized for this operation. In order to be used for this <br /> operation,they will be maintained so as not to become a reclamation liability. Additional temporary <br /> structures, including but not limited to"zircon-type"steel containers may be brought onsite as needed. <br /> No construction of new permanent structures is planned, and no removal of existing structures is <br /> planned. Existing onsite structures are currently in compliance with the county. <br /> The sorting of the old waste rock is the key to this operation. It will separate the ore from the material <br /> with insufficient value through the use of X-ray sorting equipment that will be brought and assembled <br /> onsite. Mining activities therefore will include the unsorted waste rock stockpiles feeding the sorter,the <br /> sorting equipment, power plant and fuel supply, earthmoving equipment, and sorted materials <br /> stockpiles. Locations of these activity areas are shown on the Mining Map in Exhibit D. <br /> The mining plan will proceed until the stock of old waste rock considered to yield economic values within <br /> the permit have been exhausted. At this point the operator may opt to expand the permit boundary <br /> under a 112 permit conversion or commence final reclamation. <br />