Laserfiche WebLink
The reduction of surface area also affects the bond calculations. The original volume measurement of <br /> 1,130 yd3 would be reduced to 895 yd3 if the access road calculation are modified to a 30% <br /> disturbance where applicable. <br /> And lastly, <br /> Correcting the name of the Claimant or Permittee: <br /> The original application(Sections 3 and 7A)listed name of Standard Metals as the Claimant or <br /> Permitee. This is incorrect. The correct name of the Claimant or Permittee is Standard Minerals,Inc. <br /> with the same address and contact details. <br /> I appreciate the opportunity to comment on the Notice of Incompleteness. Please let me know if you <br /> have any comments or questions. <br /> Sincerely, <br /> C;-zL <br /> Tony Adkins <br /> Geologist consulting to World Industrial Minerals <br /> Nucla, CO <br />