My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-02_PERMIT FILE - P2023009
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2023009
>
2023-06-02_PERMIT FILE - P2023009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 8:52:24 PM
Creation date
6/5/2023 7:27:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023009
IBM Index Class Name
Permit File
Doc Date
6/2/2023
Doc Name
Incompleteness Response
From
Anthony R. Adkins P. Geol, LLC
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anthony R. Adkins, P. Geol. LLC <br /> Certified Professional Geologist <br /> P.O.Box 864 29157 DD 31 Trl <br /> Nuda,CO USA 81424 <br /> 970.864.72o5 H 970.462.5888 C <br /> arapgllc@nntcwireless.com <br /> 30 May 2023 RECEIVED <br /> Mr. Lucas West JUN 0 2 2023 <br /> DRMS <br /> Room 215 Colorado Division of Reclamation, <br /> 1001 E. 62nd Ave. Mining and Saftey <br /> Denver, CO 80216 <br /> RE: Response Letter to DRMS Notice of Incompleteness for Notice of Intent P-2023-009(Ground <br /> Dear Mr. West, <br /> Standard Minerals/Thor Energy wishes to address the points listed in the above referenced <br /> Incompleteness Letter,plus file for a change in the amount of surface disturbance and the name of the <br /> Claimant/Permittee <br /> 1)Attached is a copy of an email response from the Bureau of Land Management Tres Rios Office <br /> acknowledging receipt of the NGI submittal to their office, <br /> 2)Under separate cover,the correct Financial Warranty form has been posted to the Denver office, <br /> using the address above. <br /> PrQ2 ed change in the amount of surface disturbance and related bond for material movement. <br /> The amount of surface disturbance was estimated at 0.70 acre. This was based on a very conservative <br /> approach where cross-country overland travel for a temporary access road to a drill pad was calculated <br /> at 100%disturbance. For example,if a proposed cross-country road is to be 200 feet long,then the <br /> surface disturbance was estimated at 200 ft x a 10 ft width,or a disturbance of 2,000 (0.046ac). A <br /> subsequent discussion in the field between myself and Ryan Joyner,BLM Tres Rios Assistant <br /> Manager for Land and Minerals on this NOI,indicated that they thought this approach was unrealistic. <br /> They felt that the 100%approach was appropriate for where mechanized equipment dropped a blade or <br /> used a bucket to create accessways,and that a 30%disturbance factor was more suitable for overland <br /> travel. <br /> Given that the terrain at the Ground Hog Project Area is suitable for cross-country travel to most of the <br /> proposed drill pads, Standard Minerals would like to propose a reduction in estimated disturbance <br /> calculations from 0. 70 acres to 0.50 acres. Please see Table 1 and Figure 1 below. For consistency, <br /> all drill pads are considered to be 100%disturbed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.