Laserfiche WebLink
Tmck/Loader Worksheet Cont'd Task#002 Page 2 of 4 <br /> Payload Capacity: 19.73 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 12.00 LCY <br /> Heaped Volume: 18.00 LCY <br /> Average Volume: 15.00 LCY <br /> Adjusted Volume: 18.00 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 17.06 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 3.900 LCY(heaped) <br /> Bucket Fill Factor: 0.875 Loose material- 1"and over (85 -90%)0.875 <br /> Adjusted Capacity: 3.413 LCY <br /> Job Condition Corrections: Site Altitude(11): 5300 feet <br /> Truck Loader Source <br /> Altitude Ad': 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 5 passes <br /> Excavators and Front Shovels: <br /> Truck <br /> Machine Cycle Time vs. Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.483 mutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 6"and over diameter 0.03 0.030 (Cat HB) <br /> Stockpile: Dumped by truck 0.02 0.020 (Cat HB) <br /> Truck Ownership: Independently owned trucks 0.04 0.040 (Cat HB) <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: 0.050 minutes <br /> Adjusted Loader Cycle Time: 0.533 minutes <br /> Net Load Time per Truck: 2.230 minutes <br /> Truck Cvcle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 2.230 Minutes Adjusted for site altitude: 2.230 Minutes <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Hard, smooth, stabilized, surfaced,watered, <br /> maintained 2.0 <br /> CIRCES Cost Estimating Software <br />