Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Haul Upper Overburden Pile to Upper Pit <br /> Site: Brownstone Quarry Permit Action: 2023 Insp Permit/Job#: M1997065 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 5/12/2023 County: Larimer Filename: 002 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck Generic 12-18 c ,6x4 <br /> -Loader: CAT 938H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D7R DS XR Series II <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support E ui ment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA 75 NA NA <br /> Ownership cost/hour: $24.21 $40.85 NA $92.78 NA NA <br /> Operating cost/hour: $57.28 $32.69 NA $59.50 NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. cost/hour: NA $0.00 NA $0.00 NA NA <br /> Ripper op. cost/hour: NA $0.00 NA $0.00 NA NA <br /> Operator cost/hour: $24.82 $35.97 NA $40.04 NA NA <br /> Unit Subtotals: $106.31 $109.51 NA $192.31 NA NA <br /> Number of Units: 4 2 0 1 0 0 <br /> Group Subtotals: Work: $644.26 Support: $192.31 Maine $0.00 <br /> Total work team cost/hour: $836.57 <br /> MATERIAL QUANTITIES <br /> Initial volume: 95,926 CCY Swell factor: 1.000 <br /> Loose volume: 95,926 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,550 Pounds/LCY <br /> Description: Sandstone <br /> Rated Payload: 50,300 Pounds <br /> CIRCES Cost Estimating Software <br />