Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 7 of 7 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: Pueblo <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 55.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $8,041.03 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $109.91 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.18 0.18 <br /> Return Time(Hours): 0.18 0.18 <br /> Loading Time(Hours): 1.00 NA <br /> Unloading Time(Hours): 1.00 NA <br /> Subtotals: 2.36 0.36 <br /> JOB TIME AND COST <br /> Total job time: 4.73 Hours <br /> Totaljob cost: $8,151 <br /> CIRCES Cost Estimating Software <br />