My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-31_REVISION - M1986159
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986159
>
2023-05-31_REVISION - M1986159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 10:11:56 AM
Creation date
5/31/2023 10:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986159
IBM Index Class Name
Revision
Doc Date
5/31/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Julie Mikulas - Martin Marietta Materials, Inc.
Type & Sequence
SI1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize/De-mobilize Reclamation Equipment <br /> Site: Cortner Pit Permit Action: 2023 Inspection Permit/Job#: M1986159 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 5/9/2023 County: Pueblo Filename: M159-003 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Cat 637G w/push- 59.59 $287.19 $136.92 2 $848.22 $273.84 $500.00 <br /> pull <br /> CAT 140M 16.68 $75.87 $68.22 1 $144.09 $68.22 $250.00 <br /> Drill/Broadcast 25.00 $6.25 $68.22 2 $148.94 $136.44 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $14.79 $68.22 1 $83.01 $68.22 $250.00 <br /> (Bowie LD-90) <br /> Subtotals: 1 $1,224.26 $546.72 $1,250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Fuel Tanker,4x2,17011P $69.51 1 $69.51 $69.51 <br /> Lube Truck,4x2, 190 HP $76.19 1 $76.19 $76.19 <br /> Water Tanker,2,500 Gal. $69.51 1 $69.51 $69.51 <br /> Light Du Pickup,4x4,3/4 T. $87.03 1 $87.03 $87.03 <br /> Subtotals: $302.24 $302.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.