Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Replace Topsoil <br /> Site: Cortner Pit Permit Action: 2023 Inspection Permit/Job#: M1986159 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 5/2/2023 County: Pueblo Filename: M159-001 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 140M <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 30 NA <br /> Ownership cost/hour: $287.19 NA NA NA $75.87 NA <br /> Operating cost/hour: $277.83 NA NA NA $16.14 NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA $0.00 NA <br /> Ripper op. cost/hour: NA NA NA NA $0.00 NA <br /> Operator cost/hour: $47.07 NA NA NA $46.87 NA <br /> Unit Subtotals: $612.09 NA NA NA $138.89 NA <br /> Number of Units: 2 0 0 0 1 0 <br /> Group Subtotals: Work: $1,224.18 Support: $0.00 Maine $138.89 <br /> Total work team cost/hour: $1,363.07 <br /> MATERIAL QUANTITIES <br /> Initial volume: 54,377 CCY Swell factor: 1.125 <br /> Loose volume: 61,175 LCY <br /> Source of estimated volume: 2022 annual report, 53.9 acres topsoiled <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 34.00 LCY <br /> 75%Earth <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 30.79 LCY Adjusted Capacity: 29.00 LCY <br />