My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-31_REVISION - M1986159
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986159
>
2023-05-31_REVISION - M1986159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 10:11:56 AM
Creation date
5/31/2023 10:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986159
IBM Index Class Name
Revision
Doc Date
5/31/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Julie Mikulas - Martin Marietta Materials, Inc.
Type & Sequence
SI1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2023 Updated DRMS Reclamation Cost Estimate <br /> Site: Cortner Pit Permit Action: 2023 Inspection Permit/Job#: M1986159 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/2/2023 County: Pueblo Filename: M159-000 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Replace Topsoil SCRAPERI 1 55.49 $75,637 <br /> 002 Revegetation REVEGE 1 54.00 $77,829 <br /> 003 Mobilize/De-mobilize Reclamation Equipment MOBILIZE 1 4.72 $8,151 <br /> SUBTOTALS: 114.21 $161,617 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $3,265 <br /> Performance bond: 1.05 Total= $1,697 <br /> Job superintendent: 57.11 Total= $4,290 <br /> Profit: 10.00 Total= $16,162 <br /> TOTAL O&P= $25,414 <br /> CONTRACT AMOUNT(direct+O&P)= $187,031 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $7,949 <br /> Reclamation management and/or administration: 5.00 $9,352 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $43,214 <br /> TOTAL BOND AMOUNT(direct+indirect)= $204,831 <br />
The URL can be used to link to this page
Your browser does not support the video tag.