Laserfiche WebLink
� r <br /> EXHIBIT E RECLAMATION PLAN(CONT) <br /> RECLAMATION TIMETABLE <br /> Reclamation will begin once enough area has been opened so that <br /> any reclamation completed will not be disturbed as mining progresses . <br /> This may take 5 or more years depending on the economic conditions <br /> in the area and the amount of material mined. The operator <br /> anticipates approximately 810 of the total mined land will be <br /> reclaimed by the time mining is completed. <br /> Table E-1: Reclamation Phases <br /> ACRES <br /> + <br /> Misc. <br /> (DITCHES, <br /> UNDIS- <br /> TURBED <br /> WATER REVEGE AREAS, <br /> Phase Years TOTAL AREA -TATION ROAD ETC. ) <br /> 1 3 to 5 190 .23 141 . 25 8 . 09 3 . 02 37 . 8 <br /> 2 3 to 5 145.39 100 . 15 18 . 38 24 . 07 <br /> 3 3 to 5 60. 36 37. 71 5 .35 2 .31 14 . 99 <br /> 4 3 to 5 76. 42 56. 14 05 2 . 67 10 . 56 <br /> Totals 472 .40 335 .25 38 . 88 10 . 80 37 . 48 <br /> L.G. EVERIST, INC.-WEST FARMS RESERVOIR May 2023 <br /> 25 <br />