Laserfiche WebLink
Rifle Gravel Pit#1 May 2023 <br /> Table 2.Estimated Timetable for Phases 1-4 Activities <br /> Phase/Stage Estimated Duration Estimated Depth Estimated Estimated Type of <br /> Earthwork Area Acres Earthwork Volume CY Overburden <br /> Total area=11.18 acres Total overburden=54,111 CY <br /> 30"cut=42,267 CY <br /> 6"topsoil=11,844 CY <br /> Berm area=2.87 acres Berth overburden=11,528 CY <br /> Berth topsoil=2,305 CY topsoil Clay and silt;about <br /> Phase 1 1-2 months to 1-foot of <br /> Site Development&Grading June—July 2023 Approx.0.5 feet to 1 fool Excess overburden area(temporary)=varies acres Excess overburden for sale post-bens construction(secondary commodity) topsoil,medium <br /> =30,423 CY still,slightly moist, <br /> Excess topsoil area(temporary)=varies acres brown <br /> Excess topsoil for post-mining reclamation and sale(estimate)=9,539 CY <br /> Topsoil to be kept for post-mining reclamation=566 CY(will be tarped) <br /> Topsoil that can be sold=8,974 CY <br /> Operations Pad=1.86 acres 2,999 CY Class 6 <br /> 1-2 months No additional <br /> Phase 2 August—September N/A overburden will be <br /> Mining Preparation 2023 removed during this <br /> phase. <br /> Phase 3 3-5 years 10.43 acres 292,810 CY <br /> Mining Extraction Sept 2023—Dec.2026 17—21 feet Varies <br /> to Dec.2028 <br /> The estimated area to be mined(processed and stockpiled)at 30%is The estimated amount of material mined and processed at 30%=88,000 See Boring 4 <br /> approximately 4.78 acres CY Remove estimated <br /> 21 feet 6"of clay and silt; <br /> 30% 1—1.5 years (gravel layer thickness) gravel layer <br /> estimated at 1 foot <br /> to 22 feet below <br /> surface. <br /> Cumulative area estimated at 60%=6.83 acres Cumulative volume of material mined and processed at 60%=140,000 CY See Boring 3. <br /> Remove estimated <br /> 5.5 feet to 6 feet of <br /> 60% 1—1.5 years 21 feet clay and silt <br /> (gravel layer thickness) Estimated area mined and processed between 30%and 60%=2.05 acres Estimated volume of material mined and processed between 30%and 60% overburden;gravel <br /> =52,000 CY layer estimated at 7 <br /> feet to 27 feet <br /> below surface. <br /> Cumulative area estimated at 100%=10.43 acres Cumulative volume of material mined and processed at 100%=292,810 See Boring 3. <br /> CY Remove estimated <br /> Estimated area mined and processed between 60%and 100%=3.60 acres 5.5 feet to 6 feet of <br /> 100% 1—1.5 years 21 feet Estimated volume of material mined and processed between 60%and clay and silt <br /> (gravel layer thickness) 100%=152.810 CY overburden;gravel <br /> layer estimated at 7 <br /> feet to 27 feet <br /> below surface. <br /> Berm Reclamation from Phase 1=2.87 acres Berth reclamation completed in Phase 1 <br /> Welland Reclamation fringe=0.7 acres Wetland reclamation to be completed using topsoil retained as part of <br /> Phase 1=566 CY,surface the wetland fringe to a depth of 6" <br /> Phase 4 6 months NA Reclaimed Pond Surface Area=9.55 acres NA <br /> (Final Reclamation) December 2026-2028 Upland Buffer Area is not expected to require active reclamation due to <br /> Upland Buffer Area=4.02 acres lack of surface disturbance.Incidental seeding and/or weed treatment only. <br /> Operations Pad to be maintained as storage=1.86 acres Operations Pad will remain as Class 6 road base applied in Phase 2,and <br /> maintained for use in Scott's regional operation <br /> 'The depths and thicknesses are estimated and based upon the nearest exploratory bodng logs included in Attachment C. <br /> 32 <br />