Laserfiche WebLink
applicable. <br /> 6.4.6 EXHIBIT F-Reclamation Plan Map <br /> 51. Figure 14 Exhibit E1 is the Reclamation Plan Map and therefore should be included under Exhibit <br /> F, not Exhibit E. <br /> This figure has been moved to Exhibit F. <br /> 52. Figure 14, Exhibit E1 does not state or depict the 5H: 1V slopes associated with the wetland <br /> fridge areas, pursuant to Rule 6.4.6(a). <br /> The exhibit does depict the SH:1V slope in plan view.A typical detail has been added to this exhibit to <br /> display the slope in profile for additional clarity. <br /> 53. Figure 14, Exhibit E1 does not state or depict which areas will be reclaimed to upland areas. Only <br /> the berms(2.87 ac)are noted as be revegetated, but not what type.Additionally, per the <br /> reclamation plan and Figure 15 Exhibit E2, 6.5 acres are to be reclaimed as upland. Please shade <br /> or otherwise note which areas will receive upland revegetation, per Rule 6.4.6(b). <br /> The upland reclamation area is limited to the berm, which is approximately 2.87 acres,shaded in gray. <br /> 54. Figure 14 Exhibit E1,the legend does not specifically relate to reclamation of the affected lands. <br /> Legend describes other land types/features not related to the reclamation treatments of the <br /> affected lands. Per Rule 6.4.6(b) revise the legend to sufficiently portray the proposed final land <br /> use for each portion of the affected lands. <br /> The legend has been updated. <br /> 55. Reclamation Plan Map(Figure 14, Exhibit E1) is not singed as required by Rule 6.2.1(b). <br /> Noted.All exhibits and maps will be signed and stamped by a PE. <br /> 6.4.7 EXHIBIT G-Water Information <br /> 56. Explicitly state if the mining operation is expected or not expected to directly affect surface or <br /> groundwater systems, Rule 6.4.7 (1)or(2). <br /> Mining operations will have an effect on groundwater systems as water is removed with mined <br /> material,used for dust control,and evaporative losses. This has been described in detail in the Mining <br /> Plan and Substitute Water Supply Plan(SWSP). <br /> 57. Commit to providing the Division with all necessary water rights documentation for mining and <br /> reclamation once it becomes available. <br /> a. The adequacy response#36 stated that per Section 8.3 it a Substitute Water Supply Plan <br /> (SWSP)was filed on June 13, 2022. However this language is not actually contained <br /> within the revised Exhibit G section 8.3. Neither is language stating that a Gravel Well <br /> Pond Permit has been applied for. Please correct the narrative language and include <br /> application documentation for both permits until such time the permit is issued. <br /> Section 8.4 includes language that specifies that the SWSP was filed on June 13,2022. The Gravel Pit <br /> Well Permit Application(Division of Water Resources Form GWS-27)was also received by the Division <br /> of Water Resources on June 13,2022. <br /> 10 <br />