My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-04_REVISION - M1994121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994121
>
2023-05-04_REVISION - M1994121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 11:45:03 AM
Creation date
5/8/2023 7:48:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994121
IBM Index Class Name
Revision
Doc Date
5/4/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Arthur Vasquez - O & A Stone LLC
Type & Sequence
SI2
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Grade large overburden/waste rock stockpile to 3H:1V <br /> Site: Vasquez Quarry No 2 Permit Action: Insp 2023 Permit/Job#: M1994121 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 4/13/2023 County: Boulder Filename: 001 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series II <br /> Horsepower: 240 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $92.78 NA <br /> Operating Cost/Hour: $79.33 100 <br /> Ripper own. $g 37 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.50 10 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $221.01 <br /> Total Fleet Cost/Hour: $442.03 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 7,200 <br /> Swell factor: 1.215 <br /> Loose volume: 8,748 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,022.9 LCY/hr <br /> production: <br /> Materials consistency description: Rock,avg. ripped or blasted 0.7 <br /> Average push -10% <br /> gradient: <br /> Average site altitude: 6,200 feet <br /> Material weight: 3,300 lbs/LCY <br /> Weight description: Decomposed rock-75%Rock,25%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.