My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-04_REVISION - M1994121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994121
>
2023-05-04_REVISION - M1994121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 11:45:03 AM
Creation date
5/8/2023 7:48:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994121
IBM Index Class Name
Revision
Doc Date
5/4/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Arthur Vasquez - O & A Stone LLC
Type & Sequence
SI2
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Vasquez Quarry No 2 Permit Action: Insp 2023 Permit/Job#: M1994121 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 4/13/2023 County: Boulder Filename: M121-000 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Grade large overburden/waste rock stockpile to DOZER 2 9.58 $4,233 <br /> 3H:1V <br /> 002 Grade TS DOZER 2 3.88 $1,714 <br /> 003 Reve etate disturbed land REVEGE 71 8.00 $6,389 <br /> 004 Mobilization/Demobilization MOBILIZE 1 1 2.46 $2,618 <br /> SUBTOTALS: 23.92 $14,954 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $302 <br /> Performance bond: 1.05 Total= $157 <br /> Job superintendent: 8.00 Total= $601 <br /> Profit: 10.00 Total= $1,495 <br /> TOTAL O&P= $2,556 <br /> CONTRACT AMOUNT(direct+O&P)= $17,510 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $744 <br /> Reclamation management and/or administration: 5.00 $875 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $4,675 <br /> TOTAL BOND AMOUNT(direct+indirect)= $19,629 <br />
The URL can be used to link to this page
Your browser does not support the video tag.