My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-28_REVISION - P2013008
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2013008
>
2023-04-28_REVISION - P2013008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2023 8:44:12 PM
Creation date
5/1/2023 9:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013008
IBM Index Class Name
Revision
Doc Date
4/28/2023
Doc Name
Request For Final Release
From
GL Engineering, PLLC
To
DRMS
Type & Sequence
SL1
Email Name
ANM
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'fix_... ''� .., b�>y ��, n_ '`�.,..•�'... ""t.:: a; <br /> Photo 8—Looking north from edge of excavation area showing unreclaimed mounds <br /> The area was reclaimed in March of 2023 by first using a dozer to regrade the highwalls and the mounds, <br /> followed by backdragging a steel beam with a front end loader to smooth out the regraded area,then <br /> followed by the importation of 375 tons of topsoil, which was then spread evenly over the regraded <br /> area. The topsoil was purchased from a nearby supplier.Approximately 3-4 inches of soil was placed on <br /> the area. Broadcast seeding was then conducted using the prescribed mix. Backdragging then occurred <br /> to cover the seed with the soil already placed. <br /> The following pictures show various stages of the reclamation efforts. <br /> Page 11 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.