Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 11 of 11 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,3,500 Gal. $48.30 1 $48.30 $48.30 <br /> Light Duty Pickup,4x4,3/4 T. $87.03 1 $87.03 $87.03 <br /> Fuel Tanker,4x2, 170 HP $69.51 1 $69.51 $69.51 <br /> Lube Truck,4x2, 190 HP $76.19 1 $76.19 $76.19 <br /> Subtotals: $281.03 $281.03 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: PUEBLO.CO <br /> Total one-way travel distance: 26.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $22,047.48 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $292.27 <br /> ** one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipmen <br /> t <br /> Haul Time(Hours): 0.52 0.52 <br /> Return Time(Hours): 0.52 0.52 <br /> Loading Time(Hours): 1.70 NA <br /> Unloading Time(Hours): 1.70 NA <br /> Subtotals: 4.44 1.04 <br /> JOB TIME AND COST <br /> Total job time: 8.88 Hours <br /> Total job cost: $22,340 <br /> CRCES Cost Estimating Software <br />