My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-24_REVISION - M1998038 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998038
>
2023-04-24_REVISION - M1998038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 8:48:58 AM
Creation date
4/24/2023 9:23:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998038
IBM Index Class Name
Revision
Doc Date
4/24/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
James H. Kirkland- Kirkland Construction R.L.L.P.
Type & Sequence
SO1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob <br /> Site: Two Rivers Permit Action: 2023 Inspection Permit/Job#: M 1998038 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 4/17/2023 County: Pueblo Filename: M038-005 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per dam <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK <br /> EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Cat D7R DS XR 35.93 $101.15 $101.82 1 $202.97 $101.82 $250.00 <br /> Series II <br /> Cat 637G 57.28 $264.49 $136.92 3 $l,204.23 $410.76 $750.00 <br /> CAT 14M 23.57 $114.80 $68.22 1 $183.02 $68.22 $250.00 <br /> Drill/Broadcast 25.00 $6.25 $68.22 2 $148.94 $136.44 $500.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $14.79 $68.22 1 $83.01 $68.22 $250.00 <br /> (Bowie LD-90) <br /> CAT 950H high 20.13 $46.76 $68.22 2 $229.96 $136.44 $500.00 <br /> lift <br /> Subtotals: $2,052.13 $921.90 $2,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.