Laserfiche WebLink
Reclamation Permit Application Package (111) <br /> Exhibit C—Mining Plan <br /> SH-71 Passing Lanes Revision Date: March 01, 2023 Page 3 of 3 <br /> CDOT Project Number: STA 0712-019 <br /> IHC Scott Project Number: 22406 <br /> The borrow area is located on private property and access will be controlled by the owner before and after <br /> reclamation.There are no access restrictions for this property.The borrow area will not pose a risk to public safety. <br /> Conceptual Schedule for Disturbance and Reclamation <br /> The conceptual schedule includes: <br /> • The anticipated re-start date of the SH-71 Passing Lanes Project is April 10, 2023. <br /> • Borrow activities will begin on or around April 10, 2023 and continue through approx. May 23, <br /> 2023. <br /> • Reclamation of the borrow area will begin once borrow material has reached project needs. <br /> • Pre-existing access roads used to access the borrow area will be re-graded, if necessary. <br /> • Removal of temporary erosion control, if applicable. <br /> • Reclamation will be deemed complete once the reclaimed surfaces of the borrow area have been <br /> re-graded to safe and stable condition and the requirements listed in the Duties of Operators— <br /> Reclamation Plans, Section 34-32.5-116 of Title 34 - Mineral Resources, Article 32.5 - Colorado <br /> Land Reclamation Act for the Extraction of Construction Materials have been met, when <br /> applicable. <br /> IHC SCOTT <br />