Laserfiche WebLink
Reclamation Permit Application Package (111) <br /> Exhibit C— Mining Plan <br /> SH-71 Passing Lanes Revision Date: March 01, 2023 Page 2 of 3 <br /> CDOT Project Number: STA 0712-019 <br /> IHC Scott Project Number: 22406 <br /> IVH �c t is p nsible party for the mining described in this Mining Plan. <br /> March 1, 2023 <br /> ignature Date <br /> Blake Foerster IHC Scott—Project Manager <br /> Name Title <br /> Description of Current Site Conditions <br /> The location and legal description of the borrow area is provided on the Borrow Area Location Map in Exhibit A. <br /> Features of the site include: <br /> • The borrow area sits on a large parcel of land. <br /> • The Property is located—9 miles south of Last Chance,Colorado on the east side of SH-71 north of CR 3. <br /> • Borrow area GPS coordinates; latitude: 39, longitude: 103 (-10.0 acres) <br /> • Borrow area legal description: 5S 55W Sec 8 SE1/4 <br /> • The ground surface at the borrow area consists of partially exposed soil, weeds, and primarily dormant <br /> grasses. <br /> • The parcels of land directly east and south of the borrow area are currently used for agricultural purposes. <br /> • It is not anticipated that groundwater will be encountered during borrow activities. <br /> • The borrow area can be accessed from one location off CR J.A new access road will be constructed on the <br /> Property during borrow activities. <br /> • There are no permanent structures located on the Property or borrow area,or within 200'of the proposed <br /> borrow area <br /> • The Property and borrow area are relatively flat. <br /> • There are no current activities being conducted at the borrow area location. <br /> Description of Mining Operation (Borrow Area) <br /> During the SH-71 Project IHC Scott will use heavy equipment to excavate approximately 15,000 cubic yards of <br /> material from the 10-acre borrow area.The operator will perform stripping operations utilizing front-end loaders, <br /> dozers, and blades. All stripped topsoil will be stockpiled on-site prior to borrow material removal. The borrow <br /> material will be excavated from the site to a depth of approx. 15 feet utilizing a dozer and properly sized <br /> excavators/loaders. The borrow material will be transported to the Project location using highway haul trucks. <br /> The borrow material will be used to replace geotechnically unsuitable material and/or as fill to bring the Project <br /> site to planned grade and geotechnically unsuitable soils from the roadway construction project will be <br /> transported back to the borrow area and utilized as fill material, where suitable. Prior to borrow activities the <br /> operator will install erosion control measures at the Property and borrow area (i.e., silt fence, erosion logs, <br /> temporary berms, etc.), as needed. Temporary measures will be deployed and maintained throughout the <br /> duration of the permit to ensure compliance with all requirements associated with this work. <br /> Access Restrictions/Public Safety <br /> IHC SCOTT <br />