My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-29_REVISION - M2006081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006081
>
2023-03-29_REVISION - M2006081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 9:21:41 AM
Creation date
3/30/2023 9:24:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006081
IBM Index Class Name
Revision
Doc Date
3/29/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Daniel J. and Barabara J. Gaudreault
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: Regrade Mining Faces <br /> Site: Big"G"Gravel Pit Permit Action: ANM 23 Inspection Permit/Job#: M2006081 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 3/8/2023 County: Pueblo Filename: Feb 2023 <br /> Inspection <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $124.85 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own. $13.10 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $1.83 25 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $277.44 <br /> Total Fleet Cost/Hour: $277.44 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 2,500 <br /> Swell factor: 1.330 <br /> Loose volume: 3,325 LCY <br /> Source of estimated volume: DRMS(1300' x 20' 2:1 to 3:1) <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 60 feet <br /> Unadjusted hourly 1,246.9 LCY/hr <br /> production: <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push -30% <br /> gradient: <br /> Average site altitude: 4,450 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock, 50%Earth <br /> Job Condition Correction Factor Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.