My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-29_REVISION - M2006081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006081
>
2023-03-29_REVISION - M2006081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 9:21:41 AM
Creation date
3/30/2023 9:24:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006081
IBM Index Class Name
Revision
Doc Date
3/29/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Daniel J. and Barabara J. Gaudreault
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Summary of Reclamation Tasks <br /> Site: Big"G"Gravel Pit Permit Action: ANM 23 Inspection Permit/Job#: M2006081 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/8/2023 County: Pueblo Filename: Feb 2023 <br /> Inspection <br /> User: ANM <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Regrade Mining Faces DOZER 1 4.69 $1,300 <br /> 002 Minor Grading on Mining Areas GRADER 1 25.17 $6,302 <br /> 003 Rip Process Area RIPPER 1 9.16 $2,593 <br /> 004 Rip Haul Roads RIPPER 1 4.20 $1,208 <br /> 005 Replace Subsoil&Topsoil SCRAPERI 1 46.45 $77,116 <br /> 006 Replace Topsoil on Haul Roads DOZER 1 7.33 $2,034 <br /> 007 Revegetate the Site REVEGE 1 76.50 $129,402 <br /> 008 Revegetate the Haul Roads REVEGE 1 3.10 $5,244 <br /> 009 Mob/Demob Reclamation Equipment MOBILIZE 1 4.40 $9,086 <br /> SUBTOTALS: 181 $234,285 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $4,733 <br /> Performance bond: 1.05 Total= $2,460 <br /> Job superintendent: 94.91 Total= $7,131 <br /> Profit: 10.00 Total= $23,428 <br /> TOTAL O&P= $37,752 <br /> CONTRACT AMOUNT(direct+O&P)= $272,037 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $11,562 <br /> Reclamation management and/or administration: 5.00 $13,602 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $63,415 <br /> TOTAL BOND AMOUNT(direct+indirect)= $297,700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.