Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page 17 of 17 <br /> Subtotals: $154.91 $154.91 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: PUEBLO <br /> Total one-way travel distance: 30.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $8,900.52 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $185.89 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.60 0.60 <br /> Return Time(Hours): 0.60 0.60 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.20 1.20 <br /> JOB TIME AND COST <br /> Total job time: 4.40 Hours <br /> Totaljob cost: $9,086 <br />