My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-29_REVISION - M2006081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006081
>
2023-03-29_REVISION - M2006081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 9:21:41 AM
Creation date
3/30/2023 9:24:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006081
IBM Index Class Name
Revision
Doc Date
3/29/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Daniel J. and Barabara J. Gaudreault
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob Reclamation Equipment <br /> Site: Big"G"Gravel Pit Permit Action: ANM 23 Inspection Permit/Job#: M2006081 <br /> PROJECT IDENTIFICATION <br /> Task#: 009 State: Colorado Abbreviation: None <br /> Date: 3/10/2023 County: Pueblo Filename: M081-009 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> CatD8T-8SU 47.71 $124.85 $101.82 1 $226.67 $101.82 $250.00 <br /> CAT 14M 23.57 $114.80 $68.22 1 $183.02 $68.22 $250.00 <br /> Cat6376 57.28 $264.49 $136.92 2 $802.82 $273.84 $500.00 <br /> Drill/Broadcast 25.00 $6.25 $68.22 1 $74.47 $68.22 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $14.79 $68.22 1 $83.01 $68.22 $250.00 <br /> (Bowie LD-90) <br /> Drill/Broadcast 25.00 $6.25 $68.22 1 $74.47 $68.22 $250.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: $1,444.46 $648.54 $1,750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Du Pickup,4x4,3/4 T. $87.03 1 $87.03 $87.03 <br /> Fuel Tanker,4x2,17011P $30.60 1 $30.60 $30.60 <br /> Lube Truck,4x2,19011P $37.28 1 $37.28 $37.28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.