Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Cut/Fill Working Face <br /> Site: The Orr Pit Permit Action: 2023 Inspection ANM Permit/Job#: M2009074 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 3/14/2023 County: Pueblo Filename: 001 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $124.85 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own. $13.10 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $7.30 100 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $282.92 <br /> Total Fleet Cost/Hour: $282.92 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,748 <br /> Swell factor: 1.165 <br /> Loose volume: 2,036 LCY <br /> Source of estimated volume: Application <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 852.6 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push -30% <br /> gradient: <br /> Average site altitude: 4,630 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock, 50%Earth <br />